Titanium pipe spool prefabricated to your isometric: pipe, fittings and flanges cut, fitted and welded under argon, then PMI-checked, measured,…
Titanium pipe spool prefabricated to your isometric: pipe, fittings and flanges cut, fitted and welded under argon, then PMI-checked, measured, pickled and shipped tagged. NPS ½ to 24 in (DN 15–600), schedules 5S to 80S, in Grade 2, Grade 5 and Grade 7.
Titanium welding on a scaffold is a slow, exposed job. The purge has to hold, the fit-up has to be clean, and one blue weld means cutting the joint out and starting again with less room than the first time.
In the shop the gas setup is fixed, the WPS is written, and the welder does the same joint all week. We build to the drawing you send. Send the isometric with line numbers, sizes, schedules and flange callouts, and a spool breakdown comes back with the price before any metal is cut.
| Step | What we do | Record |
|---|---|---|
| Material pick | Pipe and fittings pulled to the line list, heat numbers logged | Heat number list |
| Cutting | Plasma or saw cut, bevel machined to B16.25 | Cut sheet |
| Fit-up | Jigged to the isometric, root gap checked, purge dam fitted | Fit-up check sheet |
| Welding | GTAW, ERTi-2 filler, argon purge to a written WPS | Weld map, welder ID |
| Inspection | Weld colour graded, PMI, dimensional check to the drawing | PMI and dimensional report |
| Finishing | Pickled and passivated, ends capped, line number stencilled | Final release note |
Titanium takes up oxygen and nitrogen above about 400 °C and does not show the damage until the joint has been in service for a while. Root and hot pass run under argon, trailing shields cover the cap, and the purge stays on until the weld is cool enough to touch.
Colour is the field test. Silver or light straw passes. Blue, purple or grey is contamination, and the joint is cut out rather than dressed over, because a wire brush does not undo an interstitial pickup. PMI runs on pipe and fittings before welding, not on the finished spool: after welding, a mixed heat is already welded in.
| Item | Range |
|---|---|
| Line size | NPS ½–24 (DN 15–600) |
| Schedule | 5S, 10S, 40S, 80S |
| Grades | WPT2 / WPT5 / WPT7 with matching pipe to B861 or B862 |
| Spool length | Up to on request per shipping limit |
| Dimensional tolerance | on request |
| Hydrotest | on request |
Shipping sets the limit before the shop does. A 40 ft container takes about 11.8 m (38 ft) of spool, so a longer run is split at a flange or a field weld and tagged as two pieces, with the field weld count written on the breakdown.
| Item | Detail |
|---|---|
| Packing | Flange faces boarded, ends capped, spools crated on saddles — packing detail |
| Marking | Line number, spool number and heat numbers stencilled on each piece |
| Lead time | on request |
| Minimum order | on request |
What do you need to quote a spool?
The isometric or a dimensioned drawing, the line list with sizes and schedules, grade, flange callouts and any NDT requirement. A PDF is enough; native CAD saves a day of checking.
Do you weld Grade 5 spools?
Yes, though Grade 5 needs tighter purge control and matched filler, ERTi-5 rather than ERTi-2. Most corrosive service still lands on Grade 2, which welds more forgivingly.
Can you match an existing spool without a drawing?
Usually, from a measured survey or the old spool sent to us. We mark it up, send the drawing back for approval, and cut after that.
Send the isometric, the line list and your delivery date. The reply is a spool breakdown with weld counts, so you can compare it against building on site.